Technical guarantee measures of steel structure workshop engineering
release time:2019/4/25 23:38:33      hit count:2022

Technical guarantee measures of steel structure workshop engineering

In order to ensure that the fabrication and installation of your steel structure meet the established standards, the following measures are hereby formulated:

1, in strict accordance with the "steel structure engineering construction and acceptance code" gb50205-2001 provisions of the material, line, material, group, welding technical requirements for the steel structure production, hoisting.

2, roof support, steel beam roof beam and other components according to 1:1 lofting, blanking, and considering the contraction of the weld.

3. H-shaped steel group vertical welding machine, submerged arc welding machine, h-shaped steel rectification machine, leveller and other equipment are used for processing, welding and rectification of h-shaped steel group.

4. The friction contact surface of components shall be constructed in accordance with the reasonable construction process. After treatment, the friction surface of components shall not be painted or defaced. The friction coefficient test adopts bolt specimen. The friction treatment, material, high-strength bolt and component are the same, and the friction coefficient is 0.45.

5. The bolt connection hole shall be drilled by CNC drilling machine and its pass rate shall be checked.

6. Pre-assembly of components before leaving the factory, and record the assembly.

7. Hoist steel column and other vertical long-shaped members with the lifting point at 2/3 of the column length. Hoisting roof truss beam and other components, the lifting point is set at equal distance from the key position.

8. Pay attention to the influence of wind force, sunshine temperature and temperature difference during alignment correction of steel column. Therefore, no correction shall be made when the wind force exceeds level 5. Install or reinforce the side beams of the corrected columns immediately. Calibration should be carried out in the morning or when the sun is cooler and in the environment.

9, the production of glass commissioned professional glass manufacturers production and processing. The production of glass shall be in accordance with the current national standards and specifications, and the owner shall confirm the product samples, and provide relevant test reports and supporting documents.

Before the installation of steel structure, the foundation shall be retested to ensure that it meets the installation requirements. During the installation of steel structure, the measurement and correction shall be carried out and the error shall be controlled within the allowed range.

11. Carry out a comprehensive self-correction and self-inspection in accordance with the installation manual and acceptance standards to prevent errors in the work. The quality inspector should make a detailed inspection and record of the work every day, and check the quality together with the owner's representative and on-site project supervisor.

12. Check the material and quality guarantee of the steel. The quality guarantee shall mainly pay attention to the data of yield point, cold bending, room temperature impact and carbon content.

13. Self-inspection and mutual inspection shall be carried out in the process of steel structure fabrication, and special inspection shall be carried out in strict accordance with the steel structure engineering quality inspection and evaluation standard gb50211-95.

18, h-shaped steel plate butt weld inspection, to meet the second-grade weld quality standards.

19. Code for construction and acceptance of steel structure: pay attention to the protection of finished product paint and deformation during transportation. The components are tied firmly, and the binding place is protected by rubber pad to avoid damage of ring paint. And according to the shape of transport vehicles, components of the production of supporting transport frame to prevent deformation.

20. Check the matching conditions of the column foundation axis, the column foot bolts and the bolt holes on the column bottom plate before lifting.

21. After hoisting the steel column, the surveyor shall timely measure, correct and prepare for hoisting the roof truss beam.


News you are interested in
Previous:Jiangsu steel structure development direction of four major advantages
Next:Construction technology of steel structure engineering

Back to list

主站蜘蛛池模板: 美女裸体黄网站18禁免费看影站 | 久久99国产精品蜜臀AV | 三级专区 | 久久只有这里有精品4 | 波多野吉衣在线视频 | 欧美日韩另类在线专区 | 久久超碰97中文字幕 | ofozy99国产| 亚洲综合色在线视频久 | 牛牛在线(正)精品视频 | jizz亚洲视频 | 久久影城 | 性生交大片免费看A片直播 性生生活色欲片性按摩 | 免费无码一区二区三区A片18 | 久久天天躁夜夜躁狠狠85麻豆 | 噗呲噗呲水声不断H | 最近中文字幕视频完整版在线看 | 免费被黄动漫网站在线无网观看 | 国产又色又爽无遮挡免费 | 国产精人妻无码一区麻豆 | 午夜AV福利一区二区三区内射 | 玖玖国产在线 | 日日夜夜精品免费视频 | 久久91久久91精品免费观看 | 苍井空大尺寸视频大全在线观看 | 日韩中出在线 | aaak7美国发布站 | 无码欧美黑人又大又 | 99亚洲男女激情在线观看 | 天堂а√在线中文在线 | 成熟YIN荡美妞A片视频麻豆 | 国产玖玖在线 | 真人做爰到高潮A级 | 91美女视频在线观看 | a级网站在线观看 | 欧美激情 亚洲 在线 | 免费网站日本 | 国产精品永久在线 | 青青青国产免费手机频在线观看 | h片在线 | 一级免费毛片 |